Bolevec: what is being built
Bolevec: construction projects in and around the neighbourhood, new flats and what the zoning plan allows here.
What is being built: Bolevec and around
-
In preparation Eastern ring road: Jateční – Na Roudné due 2032
The second stage of the ring road from Jateční street across the Doubravka marshalling yard and the Berounka to Na Roudné street. The project is being prepared; construction is expected between 2028 and 2032.
New homes nearby
-
PermittedBytový projekt u Studentské (Lochotín)Plzeň 1 · Bolevec · 1.5 kmMIRAS Group · 168 flats
← Back to the overview of Bolevec