Doubravka: what is being built
Doubravka: construction projects in and around the neighbourhood, new flats and what the zoning plan allows here.
What is being built: Doubravka and around
-
In preparation Eastern ring road: Jateční – Na Roudné due 2032
The second stage of the ring road from Jateční street across the Doubravka marshalling yard and the Berounka to Na Roudné street. The project is being prepared; construction is expected between 2028 and 2032.
New homes nearby
-
Under construction due 2028Nová DoubravkaPlzeň 4 · Doubravka · 0.5 kmBC Real
-
In preparationDUO ŠvabinyPlzeň 4 · Doubravka · 1.2 kmMIRAS Group · 117 flats
← Back to the overview of Doubravka