Staré Brno: what is being built

Staré Brno: construction projects in and around the neighbourhood, new flats and what the zoning plan allows here.

What is being built: Staré Brno and around

  • Under construction Janáček Cultural Centre due 2028

    A concert hall for the Brno Philharmonic between Besední and Veselá streets. The part above ground has been under construction since 2025; the city plans completion in 2028 and the public opening in 2029.

    Brno-město, 0.9 km · Source: cobude.brno.cz · checked 1. 11. 2026
  • Finished T ARENA at the exhibition centre due 2026

    A multi-purpose hall for sport and culture behind Pavilion Z, for about 13,000 spectators and with 1,300 parking spaces. Construction began in September 2023; the hall was handed over on 26 October 2026.

    Pisárky, 1.3 km · Source: cobude.brno.cz · checked 1. 11. 2026
  • Under construction Bulvár sever in Trnitá

    The main street of the new Trnitá district, linking the centre with the future station; the northern part between Uhelná and Opuštěná has been under construction since January 2026. The southern part to the station is being designed, with work due to start in 2027.

    Trnitá, 1.3 km · Source: urbancentrum.brno.cz · checked 1. 11. 2026
  • In preparation Červený kopec care complex due 2029

    A new complex for long-term patients on Červený kopec with 150 beds in single and double rooms. Construction is to start in 2027, with completion planned in 2029.

    Štýřice, 1.3 km · Source: cobude.brno.cz · checked 1. 11. 2026
  • Permitted Flood protection in Trnitá due 2030

    Flood protection on the Svratka and Svitava from Komárov to the Uhelná viaduct and the Hladíkova bridge: lowered banks, earth dykes and low walls. Permitted since September 2025, construction is planned for 2027 to 2030.

    Trnitá, 1.5 km · Source: voda.brno.cz · checked 1. 11. 2026
  • In preparation New main railway station (Europoint Brno) due 2035

    A new main station roughly where the lower station is today, behind the Zvonařka bus station. The project is being prepared; opening is expected in 2035.

    Trnitá, 1.7 km · Source: cobude.brno.cz · checked 1. 11. 2026
What is being built across Brno

New homes nearby

All new homes in Brno · on the map

← Back to the overview of Staré Brno

Live or work here and see a mistake? Let us know