What is being built: Štýřice and around

  • In preparation Červený kopec care complex due 2029

    A new complex for long-term patients on Červený kopec with 150 beds in single and double rooms. Construction is to start in 2027, with completion planned in 2029.

    Source: cobude.brno.cz · checked 1. 11. 2026
  • Finished T ARENA at the exhibition centre due 2026

    A multi-purpose hall for sport and culture behind Pavilion Z, for about 13,000 spectators and with 1,300 parking spaces. Construction began in September 2023; the hall was handed over on 26 October 2026.

    Pisárky, 1.1 km · Source: cobude.brno.cz · checked 1. 11. 2026
  • Permitted Flood protection in Trnitá due 2030

    Flood protection on the Svratka and Svitava from Komárov to the Uhelná viaduct and the Hladíkova bridge: lowered banks, earth dykes and low walls. Permitted since September 2025, construction is planned for 2027 to 2030.

    Trnitá, 1.4 km · Source: voda.brno.cz · checked 1. 11. 2026
  • Under construction Bulvár sever in Trnitá

    The main street of the new Trnitá district, linking the centre with the future station; the northern part between Uhelná and Opuštěná has been under construction since January 2026. The southern part to the station is being designed, with work due to start in 2027.

    Trnitá, 1.6 km · Source: urbancentrum.brno.cz · checked 1. 11. 2026
  • In preparation New main railway station (Europoint Brno) due 2035

    A new main station roughly where the lower station is today, behind the Zvonařka bus station. The project is being prepared; opening is expected in 2035.

    Trnitá, 1.7 km · Source: cobude.brno.cz · checked 1. 11. 2026
  • Under construction Janáček Cultural Centre due 2028

    A concert hall for the Brno Philharmonic between Besední and Veselá streets. The part above ground has been under construction since 2025; the city plans completion in 2028 and the public opening in 2029.

    Brno-město, 1.9 km · Source: cobude.brno.cz · checked 1. 11. 2026
  • In preparation New maternity hospital of FN Brno

    A new clinic of gynaecology, obstetrics and neonatology at the Brno University Hospital campus in Bohunice. In July 2026 the hospital withdrew from the contract with the builder but still plans the building and expects work to start during 2027.

    Starý Lískovec, 1.9 km · Source: fnbrno.cz · checked 1. 11. 2026
What is being built across Brno

New homes nearby

  • In preparation
    Bytový dům Havlenova
    Brno-střed · Štýřice · 0.2 km
    IMOS development · 230 flats
  • In preparation
    Bytový dům Kamenná
    Brno-střed · Štýřice · 0.4 km
    Redfoody s.r.o.
  • In preparation
    Urban Depo
    Brno-střed · Štýřice · 0.5 km
    GR8 Vojtova s.r.o. · 196 flats
  • In preparation
    Polyfunkční dům Vídeňská 3
    Brno-střed · Štýřice · 0.5 km
    Konvent Hospitálského řádu sv. Jana z Boha - Milosrdných bratří v Brně
All new homes in Brno · on the map

← Back to the overview of Štýřice

Live or work here and see a mistake? Let us know
Who are you?
Please write at least a few words (2,000 characters at most).

We’ll use the e-mail only to ask back and delete it once the report is resolved. Privacy policy