Under construction Janáček Cultural Centre due 2028
A concert hall for the Brno Philharmonic between Besední and Veselá streets. The part above ground has been under construction since 2025; the city plans completion in 2028 and the public opening in 2029.
Source: cobude.brno.cz · checked 1. 11. 2026 -
Finished T ARENA at the exhibition centre due 2026
A multi-purpose hall for sport and culture behind Pavilion Z, for about 13,000 spectators and with 1,300 parking spaces. Construction began in September 2023; the hall was handed over on 26 October 2026.
Source: cobude.brno.cz · checked 1. 11. 2026 -
In preparation New main railway station (Europoint Brno) due 2035
A new main station roughly where the lower station is today, behind the Zvonařka bus station. The project is being prepared; opening is expected in 2035.
Source: cobude.brno.cz · checked 1. 11. 2026 -
Under construction Bulvár sever in Trnitá
The main street of the new Trnitá district, linking the centre with the future station; the northern part between Uhelná and Opuštěná has been under construction since January 2026. The southern part to the station is being designed, with work due to start in 2027.
Source: urbancentrum.brno.cz · checked 1. 11. 2026 -
Permitted Flood protection in Trnitá due 2030
Flood protection on the Svratka and Svitava from Komárov to the Uhelná viaduct and the Hladíkova bridge: lowered banks, earth dykes and low walls. Permitted since September 2025, construction is planned for 2027 to 2030.
Source: voda.brno.cz · checked 1. 11. 2026 -
Being permitted Creative Centre in the former prison
The former prison on Cejl is to become a centre with a multi-purpose hall, studios, rehearsal rooms, a library, a café and a memorial. The city applied for a building permit in February 2023; dates are not known yet.
Source: cobude.brno.cz · checked 1. 11. 2026 -
In preparation Červený kopec care complex due 2029
A new complex for long-term patients on Červený kopec with 150 beds in single and double rooms. Construction is to start in 2027, with completion planned in 2029.
Source: cobude.brno.cz · checked 1. 11. 2026
New homes nearby
-
In preparationBydlení FrancouzskáBrno-střed · ZábrdoviceDostupné bydlení Francouzská, bytové družstvo · 90 flats
-
Permitted due 2029Nová AmerikaBrno-střed · TrnitáCrestyl · 243 flats
-
Under constructionApartmány Masarykova 25Brno-střed · Brno-městoBRP Group s.r.o.
-
Under constructionBrno Jedna - rezidenční budovy Neon a XenonBrno-střed · ZábrdovicePSN s.r.o.
← Back to the overview: Brno-střed